Migration playbook: On-premises data center → AWS landing zone
Move data center workloads to a multi-account AWS landing zone in planned waves, with each workload's dependencies mapped before it moves.
Migration drivers
Driver 01
Capital spending on aging servers and maintenance contracts.
Driver 02
Weeks or months to procure capacity for a new initiative.
Driver 03
No adequate secondary site, so a regional outage risks extended downtime or data loss.
Execution sequence
Each phase ends with a check you can verify — data parity, error rates, latency — and the rollback path is agreed before any traffic moves.
Cataloging workloads and dependencies, choosing a 6R strategy for each, and sizing the target architecture.
Setting up a multi-account landing zone with AWS Control Tower, plus hybrid connectivity (Direct Connect or VPN) sized to the sync traffic.
Rehosting or replatforming in waves — VMs, containers on EKS or ECS, managed databases — through automated pipelines.
Continuous database replication with AWS DMS, validation, then a DNS cutover for each wave.
Risk prevention
Risk 01
Moving oversized VM specs straight to on-demand EC2 without right-sizing.
Risk 02
Not budgeting for data transfer and hybrid connectivity during the months both environments run.
Risk 03
Carrying flat-network assumptions into the cloud instead of least-privilege IAM and segmented networks.
Before and after
We take a baseline before any change and report the same numbers after cutover, from your own tools. They are the evidence of whether the migration worked — not figures promised in advance.
Questions
Six strategies for each workload: rehost (lift and shift), replatform (for example to managed databases or containers), repurchase, refactor, retire and retain. We choose per workload, not for the whole estate.
Data in transit is encrypted (TLS, plus IPsec VPN or MACsec on supported Direct Connect links), data at rest is encrypted with AWS KMS keys you control, and access to migration tooling is limited and logged.